Whitechapel Station

Whitechapel Station
The client: Hyder Consulting
Project name: New Crossrail Station at Whitechapel
Clients requirements/
brief:
Provision of value engineering costings and Bills of Quantities.
 
   
   

Haleys Contribution:

Haleys were appointed to undertake the production of bills of quantities for the new Crossrail station at Whitechapel along with the associated shafts and tunnels. At the time of appointment the scheme was at RIBA Stage D. Based upon the current 2D design drawings Haleys constructed a 3D model. Using our 3D modelling process we produced bills of quantities based upon SMM7. Subsequently we were requested to value various engineering options. As the 3D model is dynamically linked to the requisite quantities we were able to quantify each option quickly.  Then through the use of our extensive cost database we valued the changes.

In October 2010 the design for RIBA Stage E was released to us. We amended the existing RIBA D 3D model to reflect the consolidated design and issued the associated bill of quantities (and report) within 4 weeks.  

 

Whitechapel Station 3d

 

See other case studies

 

Quantity Surveying image
Quantity Surveying

  • M&E Services
  • MEICA
  • Rail
  • Building
  • Civil Engineering

more on Quantity Surveying

3D cost modelling image & estimating
3D Cost Modelling & Estimating

  • Detailed Cost Plans
  • Fully Interactive 3D Models
  • BOQ Linked to Model
  • Estimates
  • Variation Costing

more on 3D cost modelling & estimating

Construction Services image
Construction Services

  • M&E Design
  • Performance Specs
  • M&E Coordination
  • Telecoms & IT
  • Condition Surveys

more on Construction Services

Construction law image
Construction Law

  • Claim Preparation/Defence
  • Expert Witness
  • Dispute Resolution/Adjudication
  • Risk management
  • Training

more on Construction law