Lancashire Building Schools for the Future Programme


 
Client: Bovis Lend Lease
Project: Lancashire Building Schools for the Future Programme
Clients Requirements/Brief: To provide M&E quantity surveying.

Haleys Contribution:

Haleys were employed by the main contractor Bovis to work along side their in house commercial team on Sir John Thursby Community College (SJT), and Ridgewood Community High School (RCH). Both schools share the same site and in many instances the same building, which added certain complexities' to the construction and M&E services installation, as one of the schools is designed specifically for children with special needs (General learning difficulties & physical disabilities). The construction cost for SJT & RCH was circa £33 Million, the largest of four schools in Phase 2, of a £250m building schools for the future project. Our specialist Mechanical & Electrical services were engaged specifically to manage the Mechanical, Electrical, ICT & IBMS Sub-contractors, a total package cost of circa £6 Million. Lancashire County Councils commitment to sustainability and their aim to: Minimise energy consumption, generate renewable energy on site and provide sustainability data for teaching purposes, placed a heavy demand on the M&E team. Our experience of complex technological services installations, required to meet these aims, meant that Bovis could draw on our knowledge base to manage the valuations, large volume of changes and be confident that the targets were being made.

With Haleys assistance SJT & RCH finished on time and on budget, the first school in the project to achieve this.

Ancillary information

Combined variation account value: £240k
Sustainable technologies employed: Biomass Boilers
Photo voltaic panels
Wind turbines
Absorption Chillers
Solar heat collectors
Rain water reclamation systems
E’Stack ventilation systems
Passive natural ventilation systems

See other case studies

Quantity Surveying image
Quantity Surveying

  • M&E Services
  • MEICA
  • Rail
  • Building
  • Civil Engineering

more on Quantity Surveying

3D cost modelling image & estimating
3D Cost Modelling & Estimating

  • Detailed Cost Plans
  • Fully Interactive 3D Models
  • BOQ Linked to Model
  • Estimates
  • Variation Costing

more on 3D cost modelling & estimating

Construction Services image
Construction Services

  • M&E Design
  • Performance Specs
  • M&E Coordination
  • Telecoms & IT
  • Condition Surveys

more on Construction Services

Construction law image
Construction Law

  • Claim Preparation/Defence
  • Expert Witness
  • Dispute Resolution/Adjudication
  • Risk management
  • Training

more on Construction law